Kia Optima: Panoramaroof Motor. Repair procedures
Panoramaroof Switch. Repair procedures
InspectionECM Problem Inspection Procedure
1.
TEST ECM GROUND CIRCUIT: Measure resistance between
ECM and chassis ground using the backside of ECM harness connector as
ECM side check point. If the problem is found, repa ...
Fuel Pressure Control Valve. Specifications
Specification
Item
Specification
Coil Resistance (Ω)
0.5 [20°C(68°F)
...
Power Steering
Power steering uses energy from the engine to assist you in steering the vehicle.
If the engine is off or if the power steering system becomes inoperative, the vehicle
may still be steered, but it ...